Skip to content

Preview: simulated data

//1//2//3//4
  1. //1 The fees

    2% pool fee, split onchain

  2. //2 The score

    0–1000, measured onchain

  3. //3 The treasury

    6 buckets, every unit accounted

  4. //4 The limits

    10% per project, 2-day timelock

  5. Builders are funded by contribution, inside the reinvestment loop.
Fig. 1 · Exploded view. Every layer is onchain, every limit is in code.

The autonomous growth engine for Elysium.

Build the ecosystem.
Own its growth.

Trading activity funds ecosystem builders. The treasury acquires productive assets, generates revenues, and reinvests in the next generation of Elysium projects.

Protocol snapshot

Capital loop

How trading activity becomes ecosystem ownership

Launch parameters · contracts/script/Deploy.s.sol

  1. 01

    Trading fees

    Swap fees earned by protocol-owned ACC/L liquidity are harvested into the FeeCollector. Anyone can push them through the split.

  2. 02

    Bounded split

    65% investment · 20% reserve · 10% grants · 5% operations, inside hard onchain bounds.

  3. 03

    Scored allocation

    Scores in, budgets out: priority² × risk factor, capped at 25% per project, after a challenge window of 2 days.

  4. 04

    Bounded acquisitions

    Two-key signed orders buy project tokens in tranches ≤ 20% of a budget, ≤ 1% from the oracle price, then pass risk checks.

  5. 05

    Revenue, reinvested

    Realized liquidity and staking revenue is reinvested 50% into new investments, 30% into strategies and 20% into reserves.

Enforced onchain

Guardrails that hold even if every offchain service fails

Reserve floor

RESERVE bucket ≥ 15% of NAV, checked after every risk-increasing action.

Project exposure

≤ 10% of NAV per project, holdings and LP underlying combined.

Two-key orders

An order signer signs, a separate keeper submits. Neither can act alone, and a builder can never trigger its own token.

Oracle-bounded

Output must clear the oracle-derived minimum. Stale or diverging feeds block every purchase.

2-day timelock

Every parameter change, role grant and grant payment waits at least two days. The guardian can cancel.

No generic withdraw

Assets leave the vault through four bounded paths only. The guardian can pause, revoke and cancel, never spend.

Unaudited code, nothing deployed yet. See the known limitations.

Phase 1 Contracts implemented and tested locally. Strategies are Phase 3 and ship disabled.